What to Include in a VRU Package Specification


A request for a vapour recovery unit can look complete when it includes a target flow rate. In practice, however, that number leaves many questions unanswered. A useful VRU package specification describes how the equipment must work at the site, what it will handle and how it will connect to the existing operation.
The more clearly those conditions are described, the easier it is to evaluate whether a proposed package suits the job. It also gives operators a better basis for comparing proposals that may use different equipment or design assumptions.
Start Your VRU Package Specification with the Gas Stream
Begin with the expected vapour source and operating range. State the anticipated minimum, typical and maximum flows where reliable information is available. If the figures are estimates, identify them as such and explain how they were developed.
Include the expected gas composition and any known potential for liquid carryover or condensation. Vapour from hydrocarbon storage can change as products, temperatures and operating patterns change. Those details influence equipment selection and the way liquids are handled before or during compression.
Pressure information is equally important. The specification should describe the conditions at the suction point and the pressure needed at the discharge destination. It should also identify any relevant restrictions on the tanks or receiving system. A package that meets the requested flow but cannot operate within the required pressure range will not solve the site’s problem.
Describe the Site and the Scope
The supplier also needs to know where the package will be installed. Available power, climate exposure, footprint limits and access for maintenance all affect the design. If the site has standards for instrumentation, controls or connections, include those requirements early.
Be clear about what the package is expected to contain and where the supplier’s scope ends. For example, a proposal may need to account for compression equipment, liquid handling, controls and a skid, while site piping and electrical connections may be handled separately. Defining those boundaries helps the project team understand the complete installation, not just the equipment purchase.
Finally, explain how the operation may change. If additional tanks could be connected or production is expected to vary, that information should be part of the specification. It gives the designer a chance to discuss the practical operating range and any provision for future needs.